The Planner Reset: Electric Possibilities

The Planner Reset: Electric Possibilities

$59.00
Sale price  $59.00 Regular price 
Skip to product information
The Planner Reset: Electric Possibilities

The Planner Reset: Electric Possibilities

$59.00
Sale price  $59.00 Regular price 

For the one who plans in full color — and refuses to think small.

Electric Possibilities is a signature desk bundle built for the bold planner. Vivid, energized, and ready for the ideas that keep you up at night.

What's inside:

  • Monaco Ballpoint Pen in Glitter Gray — 0.5mm fine point, black pigment ink (Dokumental, Germany), SilkTouch rubber finish, gold hardware. The pen that makes you want to write.
  • Morandi Macaron Retractable Gel Pen in Light Blue— Smooth black ink, 0.5mm gel tip, satisfying click. Light blue for the fun details.
  • Undated Spiral Project Planner — 150 pages, 100gsm, hard cover with lay-flat gold spiral binding. Project, Date, Overview, To-Do, Notes, and Top Priorities per page. 7" x 9".
  • Electric Fantasy Floral Notebook — A5, 40 ruled pages, coated soft-touch cover, acid-free paper, illustrated interior. Beautifully designed in Italy.
  • Notes & Observations Lined Notepad — 3" x 8", numbered lines 1–24 per page. Clean, minimal, always within reach.
  • Transparent Tabbed Vellum Sticky Notes in Blush Pink — 3" x 3.3", 30 sheets, file-folder tab shape, repositionable.
  • Gradient Resin Correction Tape in Purple — Smooth, silent, matte finish. Fix mistakes beautifully.
  • Pastel Highlighter in Pink — Muted chisel-tip, quick dry, no bleed. Bold and on-palette.

You may also like